Project Management Utility
House Build Estimator
Generate preliminary budget estimates for your residential builds. Calculate exact material splits and granular trade breakdowns instantly.
Project Parameters
Calculated Floor Area:
35.00 sqm
₱
% Mat
Materials: 60%
Labor: 40%
Estimated Total Investment
₱ 0.00
35 sqm @ ₱22,500 Adjusted Rate/SQM
Materials Baseline
₱ 0.00
Associated Trades Allocation
Civil / Structural (35%)
₱ 0
Electrical (15%)
₱ 0
Plumbing (10%)
₱ 0
Labor Baseline
₱ 0.00
Associated Trades Allocation
Architectural (40%)
₱ 0
*Presets reflect 2026 Philippine market averages. If calculating internationally, select your currency and input your local Base Rate manually. Structural configurations automatically apply a foundation premium. Associated Trades Allocation represents the total percentage of the overall budget dedicated to those specific sectors.